Our Projects

Showcasing Our Projects That Define Excellence

Construction of Karam River Bridge at Km 58+930

Construction of Karam River Bridge at Km 58+930

2025-08-21

⦁ Project Value: Rs.7,01,25,782.00/-
⦁ Foundation: Open foundation
⦁ 11.3 M height, 26 Numbers Wall type piers
⦁ 20.6M Length, 156 Numbers REINFORCED CEMENT CONCRETE Girders
⦁ Height of Bridge: 14M
⦁ Width of Carriageway: 11M
⦁ Total Length of Bridge: 273 m
⦁ Date of Completion – 12/08/2009
⦁ Client Name- Leighton Contractors India Pvt. Ltd. & Oriental Structural Engineers Pvt. Ltd. JV

Construction of Railway Over Bridge At KM. 6+244

Construction of Railway Over Bridge At KM. 6+244

2025-08-25

⦁ Project Value: Rs. 2,17,31,416.00/-
⦁ Foundation: Open Foundation
⦁ 8m Height, 4 Number - Wall Type piers
⦁ 16m Length, 24 Number- Reinforced Cement Concrete (REINFORCED CEMENT CONCRETE)
⦁ 23m Length, 16 Number – Pre-Stressed Concrete Girders (PSC)
⦁ Height of Bridge: 12M
⦁ Width of Carriageway: 11M
⦁ Total Length of Bridge: 55 m
⦁ Client Name- Leighton Contractors India Pvt. Ltd. & Oriental Structural Engineers Pvt. Ltd. JV
⦁ Date of Completion – 12/08/2009

Fabrication and Manufacture of  REINFORCED CEMENT CONCRETE Beams for Ajnar Bridge & Other Bridges

Fabrication and Manufacture of REINFORCED CEMENT CONCRETE Beams for Ajnar Bridge & Other Bridges

2009-08-12

⦁ Project Value: Rs. 4,25,00,000 (Without Material)
⦁ 20.6M Length of Girder
⦁ 1.5M Height of Girder
⦁ 216 Numbers REINFORCED CEMENT CONCRETE Girders
⦁ Client Name- Leighton Contractors India Pvt. Ltd. & Oriental Structural Engineers Pvt. Ltd. JV
⦁ Date of Completion – 12/08/2009

Construction of Suspension Bridge at Sanjay Setu, Indore

Construction of Suspension Bridge at Sanjay Setu, Indore

2010-01-20

⦁ Project Value: Rs. 1,09,25,555
⦁ Date of Completion – 20/01/2010
⦁ Client Name- Indore Development Authority (M.P.)

Construction of Fabrication of Office block & Industrial Shed

Construction of Fabrication of Office block & Industrial Shed

2011-03-31

⦁ Project Value: Rs.2,14,00,000.00 /-
⦁ Date of Completion – 31/03/2011
⦁ Client Name- SKM Metal Processor Pvt. Ltd. Indore (M.P.)

Design and Construction of Cable Suspension Bridge at   Upper Lake, Bhopal

Design and Construction of Cable Suspension Bridge at Upper Lake, Bhopal

2011-09-27

⦁ Client: Madhya Pradesh State Tourism Development Corporation Ltd. Bhopal (M.P.)
⦁ Length of bridge: 160 M
⦁ Width of carriageway: 4.1 M
⦁ 2400 M long Galvanized ‘B’ type Pre-stretched steel wire rope.
⦁ 6 X 36 Construction of diameter 48MM
⦁ Project Value – 3,70,52,281.00 /-
⦁ Date of Completion – 27/09/2011

Construction Fabrication & Erection of Bus Shelters along  BRTS, Package -2      (Niranjanpur Square to Palasia Square) Indore

Construction Fabrication & Erection of Bus Shelters along BRTS, Package -2 (Niranjanpur Square to Palasia Square) Indore

2013-05-01

⦁ Project Value: Rs. 8,58,96,868.00 /-
⦁ Date of Completion – 01/05/2013
⦁ Client Name- Indore Municipal Corporation Indore (M.P.)

Construction of Railing Between Bus Lane and M.V. Lane of BRTS   on A.B. Road, Indore

Construction of Railing Between Bus Lane and M.V. Lane of BRTS on A.B. Road, Indore

2013-09-30

⦁ Project Value: Rs. 5,40,23,973.00 /-
⦁ Date of Completion – 30/09/2013
⦁ Client Name- Indore Development Authority (M.P.)

The Structural works for the Chhindwara Flyover, Jabalpur Flyover, RAILWAY OVER BRIDGE, Singari Nallah and Ama Nallah of the National Highways Sector II Project Package ADB-II C8.

The Structural works for the Chhindwara Flyover, Jabalpur Flyover, RAILWAY OVER BRIDGE, Singari Nallah and Ama Nallah of the National Highways Sector II Project Package ADB-II C8.

2013-03-31

⦁ Project Value: Rs. 10,57,60,079.00 /-
⦁ Date of Completion – 31/03/2013
⦁ Client Name- Ssangyong Engineering & Construction Co. Ltd. (NHAI) New Delhi

Construction of 6 HIG Duplex, 25 HIG, Sr. A type & 9 HIG Sr. ‘B’ Type at Mayuri Parisar, Ayodhya Entension, Bhopal

Construction of 6 HIG Duplex, 25 HIG, Sr. A type & 9 HIG Sr. ‘B’ Type at Mayuri Parisar, Ayodhya Entension, Bhopal

2014-02-15

⦁ Project Value: Rs. 05,34,46,856.00 /-
⦁ Date of Completion – 15/02/2014
⦁ Client Name- M.P. Housing & Infrastructure Development Board, Bhopal (M.P.)

Construction of Boundary Wall for IIT Campus, Simrol, Indore

Construction of Boundary Wall for IIT Campus, Simrol, Indore

2015-02-20

⦁ Project Value: Rs. 06,64,97,316.00 /-
⦁ Date of Completion – 20/02/2015
⦁ Client Name- Indian Institute of Technology, Indore (M.P.)

Construction of 17 HIG Sr. ‘A’ Type houses i/c internal W/S, S/F, and Internal Electrification works at Ayodhya Nagar, Phase-V, Part-I, Bhopal.

Construction of 17 HIG Sr. ‘A’ Type houses i/c internal W/S, S/F, and Internal Electrification works at Ayodhya Nagar, Phase-V, Part-I, Bhopal.

2015-08-03

⦁ Project Value: Rs. 03,39,51,858.00 /-
⦁ Date of Completion – 03/08/2015
⦁ Client Name- M.P. Housing and Infrastructure Development Board, Bhopal (M.P.)

Construction of Balance Work of 14 HIG Dx, 9 HIG Sr. & 16 HIG Jr. Houses Including internal W/S. S/F & Internal E/f work at Housing Park Berasia Road, Bhopal (M.P.)

2015-11-30

⦁ Project Value: Rs. 03,55,13,559.00 /-
⦁ Date of Completion – 30/11/2015
⦁ Client Name- M.P. Housing and Infrastructure Development Board, Bhopal (M.P.)

Construction of Interior and Finishing work at JOTRI Dist. Jabalpur

2015-12-30

⦁ Project Value: Rs. 02,91,17,769.00 /-
⦁ Date of Completion – 30/12/2015
⦁ Client Name- P.W.D. PIU Jabalpur (M.P.)

Construction of Flyover, ROB & Bridges at Narsinghpur

Construction of Flyover, ROB & Bridges at Narsinghpur

2025-08-14

Construction

Construction of Submersible Bridge across Kshipra River Connecting Vikrant Bhairav Temple to Omkareshwar Ghat, Ujjain.

Construction of Submersible Bridge across Kshipra River Connecting Vikrant Bhairav Temple to Omkareshwar Ghat, Ujjain.

2016-01-30

⦁ Project Value: Rs. 09,15,42,000.00 /-
⦁ Date of Completion – 30/01/2016
⦁ Client Name- P.W.D. Bridge Construction Division, Ujjain (M.P.)

Construction & Development work of Mangalnath Temple Phase- II, Mangalnath, Ujjain.

Construction & Development work of Mangalnath Temple Phase- II, Mangalnath, Ujjain.

2016-04-14

⦁ Project Value: Rs. 03,51,56,516.00 /-
⦁ Date of Completion – 14/04/2016
⦁ Client Name- P.W.D. (B & R) Division, Ujjain (M.P.)

Construction & Development of Reliance JIO Center at Dhar.

Construction & Development of Reliance JIO Center at Dhar.

2016-06-15

⦁ Project Value: Rs. 01,40,36,000.00 /-
⦁ Date of Completion – 15/06/2016
⦁ Client Name- Reliance Progressive Traders Private Limited (M.P.)

Construction of Road & other Development works at Different Places of Dewas under UIDSSMT

Construction of Road & other Development works at Different Places of Dewas under UIDSSMT

2017-01-25

⦁ Project Value: Rs. 08,13,54,000.00 /-
⦁ Date of Completion – 25/01/2017
⦁ Client Name- Dewas Municipal Corporation Limited, Dewas (M.P.)

Construction of Road & other Development works at Different Places of Dewas under UIDSSMT

Construction of Road & other Development works at Different Places of Dewas under UIDSSMT

2017-01-25

⦁ Project Value: Rs. 05,13,00,000.00 /-
⦁ Date of Completion – 25/01/2017
⦁ Client Name- Dewas Municipal Corporation Limited, Dewas (M.P.)

Construction/ Extension of Major Bridge No. 575 between Indore- Rajendra Nagar Station of Western Railway

Construction/ Extension of Major Bridge No. 575 between Indore- Rajendra Nagar Station of Western Railway

2017-01-31

⦁ Project Value: Rs. 02,25,37,000.00 /-
⦁ Date of Completion – 31/01/2017
⦁ Client Name- Western Railway , Indore (M.P.)

Construction of REINFORCED CEMENT CONCRETE Culvert over BPCL pipeline crossing alignment of approach road to fourth container terminal at JN Port

Construction of REINFORCED CEMENT CONCRETE Culvert over BPCL pipeline crossing alignment of approach road to fourth container terminal at JN Port

2018-03-31

⦁ Project Value: Rs. 08,85,19,489.00 /-
⦁ Date of Completion – 31/03/2018
⦁ Client Name- Jawaharlal Nehru Port Trust, Navi Mumbai (M.P.)

Civil, Plumbing & Infrastructure works for Food Processing, Packaging and Tempreature Controlled Warehouse at Additional Patalganga.

Civil, Plumbing & Infrastructure works for Food Processing, Packaging and Tempreature Controlled Warehouse at Additional Patalganga.

2018-12-31

⦁ Project Value: Rs. 05,41,35,560.00 /-
⦁ Date of Completion – 31/12/2018
⦁ Client Name- Balmer Lawrie & Co. Ltd. Navi Mumbai (Maharashtra)

Construction of Sky Walk, Foot Bridge and other construction work at Gau Ghat, Omkareshwar, Dist. – Khandwa (M.P.)

Construction of Sky Walk, Foot Bridge and other construction work at Gau Ghat, Omkareshwar, Dist. – Khandwa (M.P.)

2020-11-30

⦁ Project Value: Rs. 13,18,00,756.00 /-
⦁ Date of Completion – 30/11/2020
⦁ Client Name- M.P. State Tourism Development Corporation Limited Bhopal (M.P.)

Development of Mahima Smart City

Development of Mahima Smart City

2020-12-31

⦁ Project Value: Rs. 21,24,15,668.00 /-
⦁ Date of Completion – 31/12/2020
⦁ Client Name- Mahima Infrastructures, Indore (M.P.)

Construction of 9 MIG Sr. 8 MIG Jr. 76 LIG & 48 EWS houses including internal water supply, sanitary fittings & internal electrifications works with development of 6.24 Hect. Land for ‘Eklavya Parisar’ at Ramsingh ki Chowki, Alirajpur (M.P.)

Construction of 9 MIG Sr. 8 MIG Jr. 76 LIG & 48 EWS houses including internal water supply, sanitary fittings & internal electrifications works with development of 6.24 Hect. Land for ‘Eklavya Parisar’ at Ramsingh ki Chowki, Alirajpur (M.P.)

2021-12-31

⦁ Project Value: Rs. 11,91,28,728.00 /-
⦁ Date of Completion – 31/12/2021
⦁ Client Name- M.P. Housing & Infrastructure Development Board, Division- Dhar (M.P.)

Construction of Kothi Tirth Ghat & Development work of Aadi Guru Shankaracharya Temple at Omkareshwar

Construction of Kothi Tirth Ghat & Development work of Aadi Guru Shankaracharya Temple at Omkareshwar

2023-04-27

⦁ Project Value: Rs. 05,29,03,553.00 /-
⦁ Date of Completion – 27/04/2023
⦁ Client Name- M.P. State Tourism Development Corporation Limited Bhopal (M.P.)

Construction of 12 additional classrooms at Bherulal Patidar College, Mhow, Dist.- Indore (M.P.)

Construction of 12 additional classrooms at Bherulal Patidar College, Mhow, Dist.- Indore (M.P.)

2023-06-30

⦁ Project Value: Rs. 04,52,99,783.00 /-
⦁ Date of Completion – 30/06/2023
⦁ Client Name- Divisional Project Engineer P.W.D. PIU- Indore (M.P.)

Construction of Bridges under Pradhan Mantri Gram Sadak Yojna (PMGSY) Package No. – MP39BR114 & MP39BR115

Construction of Bridges under Pradhan Mantri Gram Sadak Yojna (PMGSY) Package No. – MP39BR114 & MP39BR115

2023-08-31

⦁ Project Value: Rs. 08,12,86,882.00 /-
⦁ Date of Completion – 31/08/2023
⦁ Client Name- M.P. Rural Road Development Authority, Shajapur (M.P.)

Virar Viaduct

Virar Viaduct

2023-08-31

⦁ Client Name- Tata Projects Ltd. Western Dedicated Freight Corridor Corporation Ltd.
⦁ Length of Bridge – 1467.76 Meters
⦁ Foundation Type – Piling
⦁ Number of Piles – 580
⦁ Number of Pile Caps – 57
⦁ Super-Structure – Prestressed Concrete Girder with Slab
⦁ Length of Girder – 24.89 Meters

Kundheval Viaduct

Kundheval Viaduct

2023-08-31

⦁ Client Name- Tata Projects Ltd. Western Dedicated Freight Corridor Corporation Ltd.
⦁ Length of Bridge – 1127.00 Meters
⦁ Foundation Type – Open Foundation
⦁ Sub-Structure – Twin Piers – 42 numbers, Abutment – 02 numbers, Pier Diameter- 2.5 Meters
⦁ Super-Structure – Length of Girder – 24.89 Meters (Pre-Stressed Concrete Girder),
Width of Carriageway – 6.4 Meters, Height of Girder – 2.4 Meters

Public Works Department Bridge Division, M.P.  (Total Cost – Rs, 52,19,04,439.00/-) LC-03 Railway Overbridge Nagda-Kota Railway Section

Public Works Department Bridge Division, M.P. (Total Cost – Rs, 52,19,04,439.00/-) LC-03 Railway Overbridge Nagda-Kota Railway Section

2023-03-10

⦁ Client Name- P.W.D. Ujjain (M.P.)
⦁ Name of Bridge- Railway over Bridge at Nagda-Mahidpur PKG. No. – LC-03
⦁ Length of Bridge – 821.670 M, Width – 12.0 M (Pier – 12 Numbers, Abutment – 02)
⦁ Type of Foundation – Pile
⦁ Sub- Structure – Circular type Pier
⦁ Superstructure – Cast in situ girders and slab, Total Spans- 14 Numbers
⦁ Project Cost – Rs,16,42,69,952.00/-

LC-40 Railway Overbridge at LC-40 Railway Section

LC-40 Railway Overbridge at LC-40 Railway Section

2025-08-25

⦁ Client Name- P.W.D. Mandsaur (M.P.)
⦁ Name of Bridge- Railway over Bridge at Suwasra, PKG. No. – LC-40
⦁ Length of Bridge – 683.280 M, Width – 12.0 M (Pier – 10 Numbers , Abutment – 02)
⦁ Type of Foundation – Pile
⦁ Sub- Structure – Circular type Pier
⦁ Superstructure – Cast in situ girders and slab, Total Spans- 12 Numbers
⦁ Project Cost – Rs. 15,67,36,361.60/-

LC-65 Railway Overbridge at LC-65 Railway Section

LC-65 Railway Overbridge at LC-65 Railway Section

2025-08-25

⦁ Client Name- P.W.D.
⦁ Name of Bridge- Railway over Bridge at Bhawanimandi, PKG. No. – LC- 65
⦁ Length of Bridge – 738.280 M, Width – 12.0 M (Pier – 18 Numbers , Abutment – 02)
⦁ Type of Foundation – Pile
⦁ Sub- Structure – Circular type Pier
⦁ Superstructure – Cast in situ girders and slab, Total Spans- 20 Numbers
⦁ Project Cost – Rs. 20,08,98,126.40/-

Madhya Pradesh Rural Road Development Authority (M.P.)    (Total Cost – Rs. 40,90,57,000.00/-)  River Bridge across Parvati River (MP39BR331)

Madhya Pradesh Rural Road Development Authority (M.P.) (Total Cost – Rs. 40,90,57,000.00/-) River Bridge across Parvati River (MP39BR331)

2025-08-25

⦁ Client Name - Madhya Pradesh Rural Road Development Authority
⦁ Name of Bridge- High level bridge across river Parvati, PIU – Shajapur (M.P.)
⦁ Length of Bridge – 255 M, Width – 8.4 M, Carriageway – 7.5 M (Pier – 16Numbers , Abutment – 02)
⦁ Type of Foundation – Open Foundation
⦁ Sub- Structure – Wall type Pier
⦁ Superstructure –Solid slab, Total Spans- 17 Numbers
⦁ Project Cost – Rs. 11,69,61,000.00 /-

River Bridge across Man River (MP11BR327)

River Bridge across Man River (MP11BR327)

2025-08-25

⦁ Client Name - Madhya Pradesh Rural Road Development Authority
⦁ Name of Bridge- High level bridge across river Man, PIU – Kukshi (M.P.)
⦁ Length of Bridge – 255 M, Width – 8.4 M, Carriageway – 7.5 M (Pier – 16Numbers , Abutment – 02)
⦁ Type of Foundation – Open Foundation
⦁ Sub- Structure – Wall type Pier
⦁ Superstructure –Solid slab, Total Spans- 17 Numbers
⦁ Project Cost – Rs. 10,43,91,000.00/-

River Bridge across Narad River (MP29BR317)

River Bridge across Narad River (MP29BR317)

2025-08-25

⦁ Client Name - Madhya Pradesh Rural Road Development Authority
⦁ Name of Bridge- High level bridge across river Betwa at Sankheda – Badi PIU – Raisen (M.P.)
⦁ Length of Bridge – 120 M, Width – 8.4 M, Carriageway – 6.4 M (Pier – 07Numbers , Abutment – 02)
⦁ Type of Foundation –Pile Foundation
⦁ Sub- Structure –Circular type Pier
⦁ Superstructure – Cast in situ girder and slab, Total Spans- 08 Numbers
⦁ Project Cost – Rs. 7,54,12,000.00/-